InFocus SP-CEIL-UNIV instruction sheet Flush Mount Installation

Page 5

Flush Mount Installation

Drill two 5/32" (4 mm) dia. holes to a minimum depth of 2.5" (64 mm). Attach projector mount assembly (A) with two #14 x 2.5" (6 mm x 65 mm) wood screws (F) and two flat washers (E) as shown in figure 1 or figure 2 depending on joist orientation. Tighten wood screws (F) using 3/8" (10 mm) socket wrench until projector mount assembly (A) is firmly attached.

WARNING

Tighten wood screws so that projector mount assem- bly is firmly attached, but do not overtighten. Overtight- ening can damage the screws, greatly reducing their holding power.

Never tighten in excess of 80 in • lb (9 N.M.).

Make sure that mounting screws are anchored into the center of the joist. The use of an "edge to edge" stud finder is highly recommended.

Skip to step 7.

WOOD JOIST

 

FRONT OF

A

A

MOUNT

 

 

 

E

F

WOOD JOIST

FRONT OF

MOUNT

E

F

figure 1

figure 2

5 of 11

ISSUED: 10-22-04 SHEET #: 055-9236-5 01-10-06

Visit the InFocus Web Site at www.infocus.com

Image 5
Contents Applications Installations To Wood Joist Finished CeilingsModel SP-CEIL-UNIV AB C D E O P Parts ListDescription Part NumberSkip to step Install two spacers L between ceilingFor optional Cord Management Plate Q and ceilingAlligator concrete anchors are recommended Installation to Concrete CeilingsFlush Mount Installation Detail Installation to Extension Column SP-EXTARM-01, SPExtension Column UL Listed Swivel Stop Screw Connection Block Shoulder Adapter Plate Front Projector Issued 10-22-04 Sheet # 055-9236-5 IN72, IN74, IN76 IN24, IN26 Projector Alignment