Cisco Systems 3120 manual Unpacking and Inspecting the AVS, Installing Your AVS

Page 40

Chapter 3 Installing the AVS 3120

Unpacking and Inspecting the AVS 3120

Unpacking and Inspecting the AVS 3120

The AVS 3120 shipment contains the following items:

One RJ-45 to female 25-pin sub-d connector

One RJ-45 to female 9-pin sub-d connector

One RJ-45 console cable

Two 6-ft Ethernet cables

One rack mounting kit—two metal brackets and screws

Four rubber feet

Cisco Product Documentation CD-ROM and Warranty Package

Cisco AVS 3120 Application Velocity System Hardware Installation Guide

The AVS 3120 is shipped in a protective shipping carton. It is shipped as a self-contained chassis; no components can be added or removed.

Follow these steps to unpack the AVS 3120:

1.Remove the AVS 3120 accessories from the shipping carton. Save the packing materials in case you need to repack the AVS 3120 later.

2.Check the configuration of the AVS 3120 and the accessories against the items listed on the packing slip. Report any discrepancies as described in “If the Product is Damaged”.

3.Before installing the AVS 3120, review the information outlined in Chapter 2, “Preparing for Installation.”

If the Product is Damaged

If any portion of the unit or component is damaged in transit, forward an immediate request to the delivering carrier to perform an inspection of the product and to prepare a damage report. Save the container and all packing materials until the contents are verified.

Concurrently, report the nature and extent of the damage to Customer Service. Report the problem or deficiency to Customer Service along with the model number and serial number. Upon receipt of this information, you will be provided with service instructions, or a Return Material Authorization (RMA) number and shipping information. To obtain assistance, refer to the “Obtaining Documentation” section on page xiv.

Installing Your AVS 3120

Place the AVS 3120 in the desired location. You can mount it in a rack for your convenience, or place it on a solid, stable surface. If you do not plan to install the AVS 3120 in an equipment rack, proceed to the “Installing the AVS 3120 on a Workbench or Tabletop” section on page 3-5.

Racks are marked in vertical increments of 1.75 inches (4.45 cm). Each increment is referred to as a rack unit (RU). A 1-RU device is 1.75 inches (4.45 cm) tall.

Warning Only trained and qualified personnel should be allowed to install, replace, or service this equipment.

Statement 1030

Cisco AVS 3120 Application Velocity System Hardware Installation Guide

3-2

OL-11805-01

 

 

Image 40
Contents Corporate Headquarters Text Part Number OL-11805-01Page N T E N T S Removing or Replacing an AVS 3120 Altitude OL-11805-01 Preface AudienceRelated Documentation OrganizationChapter/Appendix Description Conventions Bewaar Deze InstructiesWarnung Wichtige Sicherheitshinweise Avvertenza Importanti Istruzioni Sulla SicurezzaAviso Instruções Importantes DE Segurança Guarde Estas InstruçõesGEM Disse Anvisninger Xiii Cisco.com Obtaining DocumentationProduct Documentation DVD Cisco Product Security Overview Documentation FeedbackOrdering Documentation Reporting Security Problems in Cisco Products Product Alerts and Field NoticesObtaining Technical Assistance Cisco Technical Support & Documentation WebsiteDefinitions of Service Request Severity Submitting a Service RequestObtaining Additional Publications and Information Xix OL-11805-01 Product Overview IntroductionSystem Hardware Features Front Panel FeaturesPorts and Connectors Rear Panel FeaturesEthernet Connectors Indicator Color DescriptionRJ-45 Cables Parameter Setting Pin Signal DefinitionConsole Port Signal RJ-45 Pin DB-9 /DB-25 Pin RJ-45 to DB-9 or DB-25 AdapterOL-11805-01 Preparing for Installation SafetyPreparing for Installation Safety Page General Precautions Maintaining Safety with ElectricityProtecting Against Electrostatic Discharge Preparing Your Site for Installation Copper foilChoosing a Site for Installation Environmental RequirementsEnsuring Overcurrent Protection Grounding the AVSAC Power Requirements Power Supply GuidelinesCreating a Safe Environment CablingPrecautions for Rack-Mounting Required Tools and Equipment Installing the AVS Unpacking and Inspecting the AVS Installing Your AVSIf the Product is Damaged Attaching a Two-Post Rack Bracket to the AVS Attaching the Brackets to the Sides of the AVS Installing the AVS 3120 on a Workbench or Tabletop Installing the AVS 3120 in a Two-Post RackConnecting Cables Connecting AC Power Console ConnectionBooting the AVS Booting with a Console ConnectedEstablishing a Serial Console Connection Configuring Network Settings Velocityshow interfaceYou can view the DNS settings by using the show dns command Setting the Time Indicator Color State Indicates Checking the Front Panel LEDsRemoving or Replacing an AVS Troubleshooting the AVS 3120 Hardware Checking the BasicsChecking Connections Maintaining Your AVS Maintaining Your Site EnvironmentHumidity TemperatureAltitude Dust and Particles CorrosionElectrostatic Discharge Electromagnetic and Radio Frequency InterferencePower Source Interruptions Using Power Protection Devices Uninterruptible Power SuppliesSurge Protectors Line ConditionersOL-11805-01 Specifications Dimensions and WeightPower EnvironmentOL-11085-01 Open Source License Files Apache LicenseAppendix B Open Source License Files Apache License END of Terms and Conditions OL-11805-01 D E IN-2 IN-3 IN-4
Related manuals
Manual 76 pages 29.05 Kb