Chapter 2
Installation & Setup
Before Unpacking
Unpacking
Procedure
2.1 Unpacking
Inspect the equipment container before unpacking. Note and report evidence of damage immediately.
•Place the container on a clean flat surface. Cut all straps and open or remove top.
•Remove the unit carefully and place it securely on a clean surface.
•Remove all packing material.
•Inspect the unit for damage. Report any damage immediately.
| 2.2 Site Requirements |
Power | |
| The unit should be installed within 1.5m (5 ft) of an easily accessible |
| grounded AC outlet capable of supplying 230 V (115 V). |
Front and Rear | Allow at least 90 cm (36 in) of clearance at the front of the unit for operator |
Panel Clearance | access. Allow at least 10 cm (4 in) clearance at the rear of the unit for power |
| cord connection. |
Ambient | The ambient operating temperature of |
Requirements |
Site Requirements