INSTALLATION
Access inside the equipment is only permitted to authorized service personnel.
2.1GENERAL
This chapter provides information on performing the mechanical and electrical installation of the
2.2SITE PREPARATION
The
Allow at least 90 cm (36 in) of frontal clearance for operating and maintenance accessibility. Ensure that there is a minimum of 10 cm (4 in) clearance at the end of the unit for power and interface cables.
2.3PHYSICAL INSTALLATION
The
1.Disconnect the power cord.
2.Unfasten the rear panel screw and slide back the top cover.
3.Unfasten the two screws from the bracket and remove the single bolt.
2.4ELECTRICAL INSTALLATION
2.4.1 AC Power
AC power is supplied to the
2.1