Final Dish Assembly
Leveling Front-to-Back
1.Loosen the two bolts securing the mast to the mounting foot so the mast moves freely.
2.Place a bubble level on the mast as shown in the figure. Move the mast so the bubble is centered in the level’s window.
|
|
| Level Not Level |
|
|
|
| Level Not Level | |||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Rotate mast as needed
Adjustment
Rotate mast as needed
Adjustment
Step 2: Verify that the mast is level
3. Tighten the two bolts securing the mast to the mounting foot.
Final Dish Assembly
1. Place the dish-LNB arm assembly on top of the mast (or pole).
Step 1: Place the dish assembly | Sony Step 1: Loosen the mast clamp and lower |
on the mast or pole | reflector onto the mast. Tighten the |
| clamp screws. |
2.Find the length of
If your total
Final Installation 29