Napoleon Fireplaces NZ-26 operating instructions Finishing Requirements

Page 9

9

The fi replace should be framed using 2x4 lumber. For the header and cripple studs above the fi replace it is recommended to use steel. The fireplace must be secured to the floor in all cases. Use the pallet packing brackets to secure to the fl oor. If ducting is to be installed, the minimum enclosure ceiling height is 84". Without ducting, the ceiling height may be brought down to a minimum of 72". However a fi replace enclosure with a height less than 84" must be provided with suffi cient air circulation to avoid a fi re hazard. Install ventilation grilles (minimum openings of 40 sq. inches) at both fl oor and ceiling levels of the enclosure.

Do not place insulation into the enclosure around the fi replace or the chimney. Combustible framing materials must not be closer than 6" from the side of the unit and 5" from the top of the unit.

FIGURE 7c: Finishing Requirements

FINISHING

Clearances to fi nishing materials: 63/4" minimum of non-combustible material to the top of the unit and a minimum 6 3/4" to either side.

Objects placed in front of the fi replace must be kept a minimum of 48" away from the front face of the unit.

Non-combustible material (brick, stone, cement board or ceramic tile) may protrude over the black painted surface of the fi replace front.

W415-0676 / 03.14.08

NorthlineExpress.com

http://www.northlineexpress.com

Toll-Free1-866-667-8454

Image 9
Contents NZ-26 Introduction Table of Contents Napoleon Wood Fireplace Presidents Lifetime Limited Warranty Installation Overview General Instructions General Information California Prop 65 Warning Five Options HI-EFFICIENCY HeatingLocation and Clearances Installation / FramingFraming Maintain These Minimum Clearances toFinishing Requirements FinishingEnclosure Alternate Finishing Enclosure FinishingChimney Installation Outside Combustion AIR Mantel ClearancesHearth Extension Adding Chimney Sections Offset Chimney InstallationConnection to a Masonry Chimney Installing Flashing Storm CollarIf the Chimney is Unlined Flue Tile Support for a Masonry FireplaceFinal Assembly TOP Firebrick and Baffle InstallationAttaching the Handle Left Front Fibrebrick Right Front Fibrebrick Features Optional Blower InstallationControlling Combustion AIR Achieving Proper DraftFuel Loading and Burn Cycle Operating InstructionsMaintenance Replacements Replacement PartsAccessories NorthlineExpress.com Maintenance Trouble Shooting GuideFireplace Service History NorthlineExpress.com NorthlineExpress.com