Peerless Industries PLAV 60-S, PLA 60-S manual Detail

Page 6

WARNING

• If you are uncertain that product is properly installed, call customer care.

2

Note: There are five mounting positions. The

center position is shown (right). Slide washer (J)

over wall support arm axle (D). Next, insert plastic cap (N) into axle. Then, insert holding pin (M) into axle. See detail 1.

N

J

D

M

2-1

2-2

Place arm assembly (C) with washer (J) into wall

 

plate (A). Insert axle assembly shown in detail 1

DETAIL 1

through wall plate (A), arm assembly (C), and

 

washer (J). Lock axle in place by aligning holding

A

pin (M) with notches shown in detail 2.

 

Insert socket cap screw (K) into hole at bottom of

NOTCH

 

wall support arm axle (D) as shown in detail 3.

C

Tighten screw using 9/64" allen wrench (Q).

 

DETAIL 2

Note: Fit of axle (D) into wall plate (A) and arm assembly (C) will be tight. Gently tap into place with a hammer if necessary.

 

J

 

 

K

D

 

 

 

 

DETAIL 3

3

Snap four cable management clips(R)into top or bottom of arm assembly(C)as shown. Cable ties (S) are used

 

with clips for cord management.

 

3-1Slide one mesh sleeve (T) over each cable. Use cable ties (S) to tighten mesh sleeves to cables.

T

R

C

S

6 of 9

ISSUED: 05-02-06 SHEET #: 202-9112-2 06-21-06

Image 6
Contents Maximum UL Load Capacity 175 lb 79 kg Tools Needed for Assembly Accessories JP R IV U Installation to Wood Stud Wall Skip to onInstallation to Concrete Wall IMPORTANT! Concrete must be 2000 psi density minimumDetail Assembly C I H For Plav 60 only