4.3.3 Subsystem Summary Report | . . . . . . . . . . . . . . . . . . . | 31 |
Chapter 5. | . . . . . . . . . . . . . . . . . . . | 33 |
5.1 PPRC and VSE/ESA Software Requirements | . . . . . . . . . . . . . . . . . | 34 |
5.2PPRC Hardware Requirements . . . . . . . . . . . . . . . . . . . . . . . . . 35
5.3Invoking
5.4SnapShot Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
5.4.1Primary Devices of a PPRC Pair . . . . . . . . . . . . . . . . . . . . . . 36
5.4.2 Secondary Devices of a PPRC Pair | . . . . . . . . . . . . . . . . . . . . 36 |
5.5Examples of PPRCOPY Commands . . . . . . . . . . . . . . . . . . . . . . . 36
5.5.1Setting Up PPRC Paths and Pairs . . . . . . . . . . . . . . . . . . . . . 37
5.5.2 | Recovering | from a Primary Site Failure . | . . . . . . . . . . . . . . . . . | 37 |
5.5.3 | Recovering | from a Secondary Site Failure | . . . . . . . . . . . . . . . . | 38 |
5.5.4Deleting PPRC Pairs and Paths . . . . . . . . . . . . . . . . . . . . . . . 38
5.6Physical Connections to the RVA . . . . . . . . . . . . . . . . . . . . . . . . 38
5.6.1 | Determining the Logical Control Unit Number for RVA | 39 | |
5.6.2 | Determining the Channel Connection Address | 39 | |
Appendix A. RVA Functional Device Configuration | 41 | ||
Appendix B. IXFP Command Examples | 43 | ||
B.1 SNAP Command | 43 | ||
B.1.1 | Syntax | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 43 |
B.1.2 | Using SnapShot to Copy One Volume to Another | 45 | |
B.1.3 | Using SnapShot to Copy a File from One Volume to Another | 47 | |
B.1.4 | Using SnapShot to Copy Files with Relocation | 47 | |
B.1.5 | Other Uses of SnapShot | 48 | |
B.2 DDSR Command | 49 | ||
B.2.1 | Syntax | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 49 |
B.2.2 | Using DDSR to Delete a Single Data Set | 50 | |
B.2.3 | Using DDSR to Delete the Contents of a Volume | 50 | |
B.2.4 | Using DDSR to Delete the Free Space on an RVA | 51 | |
B.3 Report Command | 52 | ||
B.3.1 | Syntax | . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . | 52 |
B.3.2 | Reporting on the Capacity of a Single Volume | 53 | |
B.3.3 | Reporting on the Capacity of Multiple Volumes | 53 | |
B.3.4 | Reporting on the Capacity of the RVA Subsystem | 53 | |
B.4 IXFP/SnapShot Setup Job Streams | 54 |
C.1 Backing up VSAM Volumes
Appendix D. IOCDS Example
Appendix E. Special Notices
. . . . . . . . . . . . .
. . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . .
. . . . . . . . . . | 59 |
. . . . . . . . . . | 60 |
. . . . . . . . . . | 63 |
. . . . . . . . . . | 65 |
Appendix F. Related Publications | 67 | |
F.1 | International Technical Support Organization Publications | 67 |
F.2 | Redbooks on | 67 |
F.3 | Other Publications | 67 |
How to Get ITSO Redbooks | 69 | |
IBM Redbook Fax Order Form | 70 | |
Index | 71 |
iv RAMAC Virtual Array,