LSI AA1167-E1 manual Installation Instructions, Tools and Equipment

Page 23

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Installation Instructions

Installation Instructions

Tools and Equipment

You will need the following tools and equipment to unpack and install a 72-inch cabinet:

Wrench (supplied in shipping crate) – to raise and lower the leveling glides

Shears – to cut the metal bands on the shipping crate

Forklift (optional) – to remove the cabinet from the shipping skid

Communication cables (optional)– additional cables to attach the cabinet to the host

72-Inch Cabinet Site Preparation and Installation Guide

15

Image 23
Contents Inch Cabinet Trademark Acknowledgments Inch Cabinet Site Preparation and Installation Guide Revision Record Date Affected Pages/Remarks Contents List of Figures List of Tables Inch Cabinet Site Preparation and Installation Guide Customer Responsibilities About this Site Preparation GuidePopulated Cabinet Cabinet FeaturesCabinet Features Reference Documentation Cabinet Features Dimensions Dimensions and WeightsUnit WeightsCabinet Area Requirements Area RequirementsEnvironment Requirements Environmental RequirementsUnit/Component Requirements Power Requirements72-Inch Cabinet AC Distribution AC Power DistributionLadder-Attach Cable for a 72-Inch Cabinet Power Box CablesAC Power Cords and Receptacles Power Cords and ReceptaclesSite Wiring and Power Considerations Tools and Equipment Installation InstructionsUnpacking and Moving the Cabinet Installation Instructions Inch Cabinet Site Preparation and Installation Guide Cabinet without Stability Foot Cabinet with Stability Foot Installing the Cabinet Transportation Instructions Inch Cabinet Site Preparation and Installation Guide