The cabinet’s AC distribution boxes use common industrial wiring. Consider the following site wiring and power source requirements:

AC power source. The AC power source must provide the correct voltage, current, and frequency specified on the manufacturer’s name plate.

Earth ground. You must have an earth grounding conductor to the cabinet’s power receptacles.

Circuit overloading. Make sure the power circuits and associated circuit breakers provide sufficient power and overload protection. To prevent possible damage to the AC distribution boxes and other components in the cabinet, isolate its power source from large switching loads (such as air conditioning motors, elevator motors, and factory loads).

Module power distribution. There are two accessory outlets inside the cabinet for module power distribution. All units attached to these outlets must be auto-ranging between 180 through 257 VAC, 50-60 Hz.

Power Interruptions. The 72-inch cabinet and its modules will withstand the following applied voltage interruptions (with or without an integrated UPS):

Input transient: 50% of nominal voltage

Duration: one half cycle

Maximum frequency: once every ten seconds

Power Failures. After total power failure, the modules within the cabinet will automatically perform a power-up recovery without operator intervention, once power is restored.

14

72-Inch Cabinet Site Preparation and Installation Guide

Image 22
Contents Inch Cabinet Trademark Acknowledgments Inch Cabinet Site Preparation and Installation Guide Revision Record Date Affected Pages/Remarks Contents List of Figures List of Tables Inch Cabinet Site Preparation and Installation Guide About this Site Preparation Guide Customer ResponsibilitiesCabinet Features Populated CabinetCabinet Features Reference Documentation Cabinet Features Dimensions and Weights DimensionsWeights UnitArea Requirements Cabinet Area RequirementsEnvironmental Requirements Environment RequirementsPower Requirements Unit/Component RequirementsAC Power Distribution 72-Inch Cabinet AC DistributionPower Box Cables Ladder-Attach Cable for a 72-Inch CabinetPower Cords and Receptacles AC Power Cords and ReceptaclesSite Wiring and Power Considerations Installation Instructions Tools and EquipmentUnpacking and Moving the Cabinet Installation Instructions Inch Cabinet Site Preparation and Installation Guide Cabinet without Stability Foot Cabinet with Stability Foot Installing the Cabinet Transportation Instructions Inch Cabinet Site Preparation and Installation Guide