Hoist Fitness CL-2403 owner manual Rubber Grip 36 LG

Page 10

A SS E M B LY

I N S T R U C T I O N S

Step 2c

F R A M E A S S E M B L Y

In this step start by pressing four 1” O.D. x 3/4” I.D. Flanged Oilites into the Foot Rest Leg Assembly. Next insert the 1” Dia. x 4 7/16” Shaft into the lower part of the Foot Rest Leg Assembly. Make sure the 1/8” hole on the Shaft is in line with the 3/16” hole on the Foot Rest Assembly. Then insert any small metal pin to hold the shaft with 1/8” hole to align for bolting. Then remove the small metal pin when finished. Place Rubber Grip (cut to fit) on both ends of the 1”Dia x 4 7/16”. Next attach the Foot Rest Leg Assembly to the Running Base Assembly as shown. Insert the 8 29/32” Long Shaft onto the upper part of the Foot Rest Leg Assembly. Make sure the 1/8” hole on the Shaft is in line with the 3/16” hole. Then insert any small metal pin into the shaft for alignment. Remove the small metal pin when finish bolting. Attach the Foot Rest Assembly to the Foot Rest Leg Assembly as shown. For the final step, slide the Rubber grip onto the 12 31/32” Long Shaft and slide two Aluminum Rings onto both side of the shaft. Attach the 12 31/32” Long Shaft to the Foot Rest Assembly. Then Wrench tighten bolts including all previously hand tightened bolts.

Part Descriptions

Hardware Descriptions

21

- Shaft (12 31/32” LG.)

G - 1/2”-13 x 1” Flat Head Cap Screw (White Zinc)

 

22

- Rubber Grip (12 9/32 LG.)

CB - Insert

 

23

- Aluminum Ring

CC - Bumper Stopper

 

24

- Foot Rest Assembly

CF - 1” I.D. Flanged Oilite

 

25

- Foot Rest Leg Assembly

 

26

- Shaft (8 29/32” LG.)

 

27

- Rubber Grip (36” LG.)

 

56

- Shaft (4 7/16” LG.)

 

Page 9

HOIST

FITNESS SYSTEMS

R

2403 Assembly

Image 10
Contents Hoist R Contents Hoist R SS E M B LY Hoist Part Descriptions Hardware Descriptions AA a AB Weight Cage S T R U C T I O N S Factory Installation Instruction only Rubber Grip 36 LG CBG 8-16 x 1 1/2 Button Head Screw White Zinc JAH Large Cam Assembly Assembly 8-16 x 2 3/4 Flat Head Cap Screw White Zinc For Assembly Instruction See For Assembly see A-1 Cam Belt 110 LG For Assembly see B-1 For Assembly see B-2 X 4 End Cap HH AE D Including all previously hand tightened bolts Grind to Flush Head Rest Upholstery Assembly SS E M B LY Part Descriptions SS E M B LY Wrench tighten bolts ACB AB AA 41 LBS. Steel Top Plate CM Top Weight Roll Pin Stem SS E M B LY R T L I S T I N G R D W a R E L I S T I N G Owners L T S I Z I N G C H a R T S H E R S I Z I N G C H a R T I G H T R a T I O S Owners I G H T T R a I N I N G T I P S Owners Hoist R Owners N E R S C a L R E F E R E N C E Hoist Hoist R Hoist Hoist Fitness Systems General Maintenance Information Owners Hoist Fitness Systems CL2403 Contents TWO People are Required to Safely Perform this JOB Hoist Part/Hardware Descriptions Step Removing the old foot rest assembly Hoist R Swapping the handgrip assembly NEW Foot Rest Assembly OLD Foot Rest Assembly S T R U C T I O N S W E X E R C I S E a R M a S S E M B L Y Installing the new foot rest assembly Step LEG Press is NOW Ready for USE 121 R T S / H a R W a R E L I S T I N G