A SS E M B LY
I N S T R U C T I O N S
Step 2e
F R A M E A S S E M B L Y
Start by sliding the 14 25/32” Long Shaft onto the Small Cam Assembly and secure it on the second hole with the 3/8” x 2” Spiral Roll Pin. Then, slide on 1.175” O.D. x .9375 I.D. x 36” Rubber Grip (cut to fit) until it is flush with the Small Cam Assembly. Next slide the Large Cam Assembly on the same size shaft (14 25/32”) and secure it with another 3/8” x 2” Spiral Roll Pin. Attach the Cam Stopper to the Large Cam Assembly on the back hole. Next slide on 1.175 ” O.D. x .9375 I.D. x 36” Rubber Grip (cut to fit) as shown. Now slide both Flange Bearings on each side of the 14 25/32” Long Shaft. Then attach to the Weight Cage as shown. Make sure to put zerk fitting facing down on Flange Bearings Wrench tighten bolts.
Part Descriptions | Hardware Descriptions | |
27 | - Rubber Grip (36” LG.) | J - |
| ||
29 | - Large Cam Assembly | G - |
| ||
30 | - Small Cam Assembly | V - |
| ||
31 | - Shaft (14 25/32” LG.) | AH - 3/8” Flat Washer ( White Zinc) |
| ||
57 | - Cam Stopper | AK - 3/8” Flat Washer (Black Zinc) |
|
BB - 3/8” Lock Nut (Black Zinc)
CH - Flange Bearing
CJ - 3/8” x 2 “ Spiral Roll Pin
CQ - Insert
Page 13
HOIST
FITNESS SYSTEMS
R
2403 Assembly