Pelco c2462m-e manual Vertical Phase Adjustment

Page 17

VERTICAL PHASE ADJUSTMENT

(24 Vac Operation Only)

When using more than one camera power supply, a brief vertical roll may occur on the monitor when a camera view is switched. To eliminate vertical roll, reverse the 24 VAC connections on one camera. If both cameras are connected to the same transformer, this should solve the problem. If reversing the connections does not solve the problem, adjust the phase control by synchronizing, or line-locking, the cameras to one another.

ADJUSTING THE PHASE CONTROL

It may be necessary to have two people in communication when synchronizing the cameras: one person at the camera and another person at the monitor to observe the vertical roll and the effect of any adjustments made at the camera.

To synchronize the cameras:

1.Choose a reference camera to which all other cameras will be phased.

2.Select a camera and synchronize it to the reference camera by turning the phase adjustment control (refer to Figure 12) clockwise or counterclockwise.

3.Each time an adjustment is made, switch back and forth between the camera you are adjusting and the reference camera. Repeat this process as many times as necessary until the roll between the cameras is no longer noticeable.

4.Adjust the phase of all other cameras by repeating steps 2 and 3. Always adjust to the reference camera selected in step 1.

NOTE: The preferred method for camera phase adjustment is to use a dual trace oscilloscope to align the vertical sync pulses of the reference camera to the selected camera(s).

Figure 12. Vertical Phase Adjustment

C2462M-E (3/09)

17

Image 17
Contents Camera System Contents List of Illustrations Regulatory Notices Important Safety InstructionsDescription Parts ListRemoving the Dome Bubble Remove the Dome BubbleSurface Installation CEILING/WALL InstallationCeiling/Wall Installation IN-CEILING Installation Suspended Ceiling Standoff Back BOX Surface Mount Ring Pinch the sides IN-CEILING Installation Fixed Ceiling or WallStandard Electrical Box Installation Surface Installation 4S Standard Electrical BOXDeep Electrical Box Installation IN-CEILING Installation 4S Deep Electrical BOX Camera Positioning Switch Settings Camera AdjustmentsTo adjust the focus Loosen the focus locking screw Focus AdjustmentVertical Phase Adjustment Dome Liner Installation Install Liner and BubbleInstalling the Dome Bubble Dome Bubble InstallationAttaching the 2.5 mm Monaural Headphone Plug Service ConnectorElectrical SpecificationsRevision History Product Warranty and Return Information