Elation Professional 250 user manual Installation via the Omega holders

Page 8

installation via the Omega holders

Screw one clamp each via a M12 screw and nut onto the Omega holders.

Insert the quick-lock fasteners of the first Omega holder into the respective holes on the bottom of the device. Tighten the quick-lock fasteners fully clockwise. Install the second Omega holder.

Pull the safety-rope through the holes on the bottom of the base and over the trussing system or a safe fixation spot. Insert the end in the carabine and tighten the safety screw.

DMX-512 control connection

Connect the provided XLR cable to the female 3-pin XLR output of your controller and the other side to the male 3-pin XLR input of the moving head. You can chain multiple

Moving head together through serial linking. The cable needed should be two core, screened cable with XLR input and output connectors. Please refer to the diagram below.

7 DESIGN WASH 250 USER MANUAL V1.0 NR

Image 8
Contents Design Wash Keep this Manual for Future Needs IntroductionSafety Instructions General Guidelines Installation Instructions Installing or replacing the lampMounting the device Page Installation via the Omega holders DMX-512 connection with DMX terminator Control Board Addr Valu DMX address setting, Slave setting Slave settingProgram Run, Master setting Main menuLamp on/off Reverse displayShut off LED display Lamp automated on with power Delay lamp onLamp on/off via external controller Pan ReverseSwitch 16 bit/8 bit Fans mode selectReset Pan degree selectRestore factory settings Lamp adjustmentSoftware version Test function of each channelFixture running time Lamp running timeClear fixture time Clear lamp timeDefine the number of steps in Run Editing the channels of each scenePage Channel 2 Cyan Color Wheel Channel 9 Zoom Channel 15 Pan fine Channel 16 Tilt fine Cleaning and Maintenance Technical Specifications Disconnect from mains before starting maintenance operation
Related manuals
Manual 2 pages 34.71 Kb Manual 1 pages 14.86 Kb