Cintel International Ltd. | diTTo User Guide |
Fig 39 Final lacing path
4.Lace Feed sprocket. In a similar way to the
5Centre the film loop between the sprockets and align the film frame bar in the centre of the aperture plate just to the right of the shuttle pins (as in Fig 40/41 below) Release the gate lace latch (Fig 36) gently lowering the shuttle pins into the film’s perforations. Lightly rock the film to verify that the pins are fully located in the film perforation. (See Gate Lacing below for more details)
Fig 40 Shuttle pin position | Fig 41 Shuttle pins over film |
Issue 3 | 23 |