3.Attach each Base Extension (45) to the Base
(52)with two M8 x 58mm Bolts (13), two M8 Flat Washers (32), and two Base Extension Nuts
(43).Note: The heads of the Bolts should be on outside of the Base Extensions.
Lower the Base (52) so that it is flat on the floor.
4.Position the Base (52) as close to the front of the treadmill as possible, as shown.
See the upper inset drawing. Locate the wire tie in the lower end of the Right Upright (54). Tie the wire tie securely around the end of the Wire Harness (39). Then, locate the other end of the wire tie in the upper end of the Right Upright. Pull the upper end of the wire tie until the Wire Harness is extending from the upper end of the Right Upright. Secure the Wire Harness to the Right Upright so that it will not fall inside.
See the lower inset drawing. Press the indi- cated Grommet (49) into the Right Upright (54).
3 |
|
|
|
|
|
| 45 |
Bolt Head | 13 |
| 43 |
45 | 32 | ||
|
|
| |
13 | 43 | 52 |
|
32 |
|
|
|
4 |
| 39 | 54 |
39 |
| ||
54 |
|
| Wire Tie |
|
|
| |
52 |
|
|
|
|
|
| 54 |
|
| 39 | 49 |
|
|
| 52 |
8