Graham Field 760000-INS-LAB-RevA08 user manual Unpacking, Pump and Mattress Installation

Page 9

Service indicator: Mechanical failure, service required; contact your Graham-field equipment provider.

Installation

Unpacking

1.Before unpacking, check for obvious damage to the car- ton or its contents. If damage is evident, please notify the carrier and your Graham-Field equipment provider.

2.Remove all loose packing from the carton.

3.Carefully remove all components from the carton.

4.Inspect all components. If damage is evident, please notify the carrier and your Graham-Field equipment provider.

PUMP and MATTRESS INSTALLATION

1. Remove all sheets, blankets, and pillows from the bed.

2.Place the mattress on top of the bed frame; ensure that the foot end symbol faces up at foot end as shown at right. Secure mat- tress to bed with straps.

3.Fold open the wire hangers on the back of the pump as shown at right.

4.Either hang the pump on the bed's foot end, as shown at right, or place the pump on a flat sur- face easily accessible to the care- giver and/or doctor.

hanger

760000-INS-LAB-RevA08

Image 9
Contents 760000 Contents Important safety precautions IntroductionIntended use of this device INS-LAB-RevA08 Functional earth for UL only Class II for UL only Equipment SymbolsProduct description Pump and mattress systemPump front Front panel second row pressure adjustment Front panel first row cycle time adjustmentFront panel third row therapy mode adjustment Pump rearFront panel fourth row Installation Pump and Mattress InstallationUnpacking Operation Quick disconnect Pressure adjustmentCleaning MaintenanceTransport cap CPR functionGeneral Maintenance Fuse replacementAir filter replacement Specifications Pump SpecificationStorage Mattress Specification WarrantyINS-LAB-RevA08 GF Health Products, Inc