SECTION
SECTION 4—PACKAGING,
HANDLING AND SET-UP
Receiving
1.Count cartons before signing shipping papers.
2.Designate someone at the facility to receive and inspect all merchandise. Use the master order acknowledgment to check off items as they are received.
3.Compare the number of cartons shipped with the number of cartons actually received and note such on the consignee copy of the freight bill. Make sure to have the truck driver sign the copy acknowledging the count.
4.If shortage occurs, IMMEDIATELY contact Invacare at (800) 333‐6900.
WARNING
DO NOT plug the power cord into a power source until assembly is complete. To do so could result in damage or personal injury.
DO NOT attempt to operate bed controls prior to completion of assembly. Otherwise, damage to bed components may occur.
Set-Up
Assembling the Bed
WARNING
DO NOT attempt to operate bed controls prior to completion of assembly as damage to bed components or personal injury may occur.
NOTE: For this procedure, refer to FIGURE 4.1 on page 24.
1.Remove packing bands from the bed. See Detail “A” of FIGURE 4.1.
2.Grasp castor mount on head‐end section of bed.
3.Pull section up and flip it over until wheels touch the floor.
4.Grasp the back‐rest of head‐end section and rotate it until the section rests on the frame section already on floor. See Detail “B” of FIGURE 4.1.
5.Locate two clevis pins (one each side of bed) on backrest of head‐end section which connect shipping brace to bed. See Detail “C” of FIGURE 4.1.
6.Remove the clevis pin from the bed and packing brace.
7.Repeat STEP 6 and 7 for the other side.
NOTE: Save clevis pins to assemble the bed.
BAR750 | 22 | Part No 1143215 |