Nighthawk SILVER STRIKE BOWLING operation manual Game Electronics, Board Installation

Page 10
Power Cable, I/O Board Pin Out

Game Electronics

I/O Board Installation

NOTE: Before installing any electronics make sure cabinet power switch is in the OFF position and the cabinet power is unplugged from the wall.

Silver Strike Bowling comes with a specially designed I/O board that works with your cabinet's already installed JAMMA harness. The I/O board is used as a connection interface between the JAMMA and the Nighthawk Chassis. Refer to the diagram on page 9.

1.Mount the I/O board into the cabinet using 6 of the 6 x ¾" Hex Washer Head Sheet Metal Screws. The existing JAMMA harness edge connector will attach to this board.

2.Cable connections:

q JAMMA Connector. Be sure it fits tightly.

q Trackball Cable to the Trackball connector. Other end will connect to the trackball.

q Power cable to the power input connector. Use the end with the 4-pin pigtail. Other end connects to the Nighthawk Chassis.

q USB cable to the USB port. Other end connects to the Nighthawk Chassis.

q Audio Cables to the I/O board audio inputs. Other ends will connect to the Nighthawk Chassis.

q Video cable (SVGA) in from Nighthawk Chassis. Low or medium resolution monitors only. See diagram on page 9. VGA or SVGA monitors are connected directly to the Nighthawk Chassis video output. See diagram page 45.

3.Coin door wiring. Note: There is no power source at the JAMMA connector. Power for coin door lights can be sourced at the Power Cable pigtail.

q Wire ground and appropriate power to the coin door lights. Depends on type of bulbs in your cabinet. q Coin input switches and bill acceptor common ground wired from JAMMA ground. See pin out

diagram on page 43.

qCoin input signal wires to coin switches normally open post and bill acceptor signal out. See pin out

diagram on page 43.

4.Coin meter wiring.

q +12 volts or + 5 volts to one lead of the coin meter. Depending on the device specifications.

q Coin count 1 signal wire from JAMMA to the other lead of the meter. See pin out diagram on page 43.

Pin Number

Wire Color

Function

1

Yellow

+ 12 Volts DC

2

Black

Ground

3

Red

+ 5 Volts DC

4

Black

Ground

5.Dip Switch SW201 set according to the type of monitor you are using.

SW201 Video Dipswitch Settings

 

0 = OFF

1 = ON

Position

Video

Resolution

Scan Rate

Monitor

Video connection

4

3

2

1

Mode

 

 

 

 

0

0

0

1

1

640 X 480

31.5 KHz

VGA

Direct from Chassis, See Diagram on Page 45

0

0

1

0

2

800 X 600

37.8 KHz

SVGA

Direct from Chassis, See Diagram on Page 45

0

1

0

0

4

340 X 255

15.75 KHz

Low Resolution

Through I/O board, See Diagram on Page 45

0

1

0

1

5

512 X 384

25 KHz

Medium Resolution

Through I/O board, See Diagram on Page 45

6.Cable Clamp. Mount near the I/O board aligned with the power connector so that you can have the USB cable pulled towards the board. This keeps the USB cable from

accidentally being jostled out of its slot. Use this clamp to keep other loose wires neat. Use wire ties where needed.

7.Speaker Wiring. SSB audio default setting is mono. Wire your speaker(s) to the left or right channel audio outputs on the JAMMA, Pins 10 and J or 11 and K respectively. If you want to operate SSB in stereo mode, both the left and Right Channels need to be connected. If audio out is set to stereo, you must have a speaker wired to each channel, plus to plus and minus to minus. If not wired properly you will not hear all of the sounds which may compromise game earnings.

8.Control panel buttons. See Finishing The Control Panel (page 13) for control panel layout, and JAMMA pin out chart (page 43).

Silver Strike Bowling™

Version 08/04

Page 8

© Copyright 2004 Incredible Technologies, Inc. All Rights Reserved. Unauthorized duplication is a violation of applicable law.

All other marks are the properties of their respective owners. All rights reserved.

Image 10
Contents Version 08/04 WARRANTY, REPAIR, and Return Policy Congratulations Table of Contents Silver Strike Bowling Kit Installation Kit Contents Including Part Numbers Your bag of parts 900265030 should include at least Installation Preparation Recommended ToolsCabinet Preparing the Cabinet for InstallationMonitor Requirements and Clean-Up Cabinet SelectionBoard Installation Game ElectronicsSilver Strike Bowling Version 08/04 Nighthawk Chassis Installation Power Switch is in the on positionTicket Dispenser Cabinet Identification Device InstallationControl Panel Trackball and Button PreparationTrackball Preparation Control Panel Overlay InstallationButton Preparation Finishing The Control Panel Finishing The Kit Side Decal InstallationMarquee Installation Side Decals and MarqueeSW202 Dip Switch Settings = OFF 1 = on Positions Function Dip Switch SettingsInitial Power-Up SW200 Dip Switch Settings = OFF 1 = on Position FunctionSilver Strike Bowling Version 08/04 Silver Strike Bowling Dedicated Version Dedicated Cabinets Dedicated ContentsCabinet Dip Switch Settings Silver Strike Bowling Version 08/04 Silver Strike Bowling Operator Menus Navigating The Menus Operator Mode MenusValue Reset Collections and Audits Reset Main MenuOperator Adjustables General SettingsGeneral Adjustments Money Slot Adjustments Value Reset General AdjustmentsValue Reset Money Slot Adjustments Value Reset Sound Adjustments Sound AdjustmentsValue Reset Reset to Factory Settings System Tests Color AdjustmentsVideo Tests Sound Tests Contrast AdjustmentsMechanical Meter Hardware/Software Hardware TestsSystem Info Check Hard Drive USB InfoVersion Info Begin TestSilver Strike Settings Check CoolingValue Reset Player Cost Schedule Player Cost ScheduleGame Audits Money AuditsGame Purchase Audits Ticket Dispenser AuditsGame Options Off. The default is set to On Delay TimeoutBall Timeout Vegas BowlingReset Game Events Value Reset Game OptionsValue Reset Game Event Info Game Event InfoDispenser Settings Value Reset Reset LeaderboardsTicket Dispenser Value Reset Dispenser Settings Ticket SettingsClear Tickets Owed Value Reset Ticket SettingsValue Reset Clear Tickets Owed Clear TicketsSilver Strike Bowling Troubleshooting Reference Appendix a Sound Problems Nighthawk Chassis Problems Trackball Harness Connection Power Cable Pin Out Diagram Jamma Harness ConnectionNighthawk Chassis and I/O Board Diagrams Detailed Cable Connection Diagram SSB Cabinet Wiring Diagram Tickets Owed Icon Trackball Template and Orientation DiagramCooling Icon Button Template and OrientationSilver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Quantity Part Description Part Number Dedicated/Kit Quantity Part Description Part Number VendorIT Vendor Information IT Sales and ServiceGeneral Numbers Incredible Technologies, Inc