Nighthawk SILVER STRIKE BOWLING operation manual Recommended Tools, Installation Preparation

Page 8

Recommended Tools

Have the following tools ready before you begin to install this kit:

q¼" Nut Driver

q7/16" Socket or Driver

q11/32" Socket

qPhillips Head #2 Screw Driver

q9/32" Drill OR 5/16" and ¾" Drill Bits

q1 1/8" Hole Saw or Drill Bit

qSmall Flat Blade Screwdriver

qJig/Sabre Saw

qRouter

qPush Button Nut Socket or Large Adjustable Pliers

qX-acto® Knife or other Sharp Knife/Razor Blade

qWire Cutters

qScissors

qTape Measure

qPutty Knife

qDecal Roller/Squeegee

qLiquid Window Cleaner & Cleaning Cloth

qVacuum Cleaner

qAny tools needed to remove parts from your existing cabinet not listed above.

Many operators notice their earnings increase with touches as simple as a fresh coat of paint and a clean cabinet. If you will be painting, you'll need these supplies:

qAir Brush or Paint Sprayer,

qPaint Brush, Paint Roller, and Pan

qPaint (and Primer) --We recommend black as a cabinet color choice.

qSandpaper

Installation Preparation

BEFORE YOU START…

Before you install the Silver Strike Bowling kit into your cabinet there are a few things you should check first:

1.Check to make sure your existing cabinet's monitor, speakers, AC power cord, and lights work. q Replace or repair where necessary.

2.Check to make sure all the necessary parts are included in your kit.

q If any are missing/damaged please contact IT's Technical Support at 847-870-7027 x121.

3.Check to make sure cabinet is wired with standard earth grounded A.C. plug compatible with local building codes and/or safety requirements.

q If not, have a qualified electrician install one (not provided).

4.Have all the necessary tools available to install this kit.

q Refer to the recommended tools list above to make sure you are prepared before you start.

5.Make sure any parts of the system (lights, monitor, etc.) are not plugged in.

q Working with any part of the system plugged in or powered on can be dangerous.

6.Keep in mind that it's been proven that the higher quality of work put into a kit installation results in a higher earning game.

q Make sure you have plenty of space, time, and focus to put into this kit installation.

Silver Strike Bowling™

Version 08/04

Page 6

© Copyright 2004 Incredible Technologies, Inc. All Rights Reserved. Unauthorized duplication is a violation of applicable law.

All other marks are the properties of their respective owners. All rights reserved.

Image 8
Contents Version 08/04 WARRANTY, REPAIR, and Return Policy Congratulations Table of Contents Silver Strike Bowling Kit Installation Kit Contents Including Part Numbers Your bag of parts 900265030 should include at least Installation Preparation Recommended ToolsPreparing the Cabinet for Installation Monitor Requirements and Clean-UpCabinet Cabinet SelectionBoard Installation Game ElectronicsSilver Strike Bowling Version 08/04 Nighthawk Chassis Installation Power Switch is in the on positionCabinet Identification Device Installation Control PanelTicket Dispenser Trackball and Button PreparationButton Preparation Control Panel Overlay InstallationTrackball Preparation Finishing The Control Panel Side Decal Installation Marquee InstallationFinishing The Kit Side Decals and MarqueeDip Switch Settings Initial Power-UpSW202 Dip Switch Settings = OFF 1 = on Positions Function SW200 Dip Switch Settings = OFF 1 = on Position FunctionSilver Strike Bowling Version 08/04 Silver Strike Bowling Dedicated Version Cabinet Dedicated ContentsDedicated Cabinets Dip Switch Settings Silver Strike Bowling Version 08/04 Silver Strike Bowling Operator Menus Operator Mode Menus Value Reset Collections and Audits ResetNavigating The Menus Main MenuGeneral Adjustments General SettingsOperator Adjustables Value Reset Money Slot Adjustments Value Reset General AdjustmentsMoney Slot Adjustments Value Reset Reset to Factory Settings Sound AdjustmentsValue Reset Sound Adjustments Video Tests Color AdjustmentsSystem Tests Mechanical Meter Contrast AdjustmentsSound Tests System Info Hardware TestsHardware/Software USB Info Version InfoCheck Hard Drive Begin TestSilver Strike Settings Check CoolingValue Reset Player Cost Schedule Player Cost ScheduleGame Audits Money AuditsGame Purchase Audits Ticket Dispenser AuditsOff. The default is set to On Delay Timeout Ball TimeoutGame Options Vegas BowlingValue Reset Game Options Value Reset Game Event InfoReset Game Events Game Event InfoTicket Dispenser Value Reset Reset LeaderboardsDispenser Settings Value Reset Dispenser Settings Ticket SettingsValue Reset Ticket Settings Value Reset Clear Tickets OwedClear Tickets Owed Clear TicketsSilver Strike Bowling Troubleshooting Reference Appendix a Sound Problems Nighthawk Chassis Problems Trackball Harness Connection Power Cable Pin Out Diagram Jamma Harness ConnectionNighthawk Chassis and I/O Board Diagrams Detailed Cable Connection Diagram SSB Cabinet Wiring Diagram Trackball Template and Orientation Diagram Cooling IconTickets Owed Icon Button Template and OrientationSilver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Quantity Part Description Part Number Dedicated/Kit Quantity Part Description Part Number VendorGeneral Numbers IT Sales and ServiceIT Vendor Information Incredible Technologies, Inc