Nighthawk SILVER STRIKE BOWLING operation manual Dip Switch Settings, Initial Power-Up

Page 17

Dip Switch Settings

 

 

SW202 Dip Switch Settings

0 = OFF 1 = ON

 

 

 

Positions

 

Function

 

 

 

 

 

 

4

3

2

1

 

 

 

 

 

 

 

 

 

 

0

0

0

0

 

 

Default

 

 

 

 

 

 

1

0

0

0

 

Enter Operator Mode Menus

 

 

 

 

 

 

 

 

 

 

 

 

 

SW200 Dip Switch Settings

0 = OFF 1 = ON

 

 

 

Position

Function

 

 

 

 

 

 

4

3

2 1

 

 

 

 

 

 

 

 

 

 

1

1

1 1

Default - Switch Is Not Used

 

 

 

 

 

 

 

 

 

 

SW201 Video Dipswitch Settings

0 = OFF

1 = ON

 

Position

 

Video

Resolution

Scan Rate

Monitor

 

Video connection

 

4

3

2

1

 

Mode

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0

0

0

1

 

1

 

640 X 480

31.5 KHz

VGA

 

Direct from Chassis, See Diagram on Page 45

 

0

0

1

0

 

2

 

800 X 600

37.8 KHz

SVGA

 

Direct from Chassis, See Diagram on Page 45

 

 

 

 

 

 

 

 

 

 

 

 

 

 

0

1

0

0

 

4

 

340 X 255

15.75 KHz

Low Resolution

 

Through I/O board, See Diagram on Page 45

 

0

1

0

1

 

5

 

512 X 384

25 KHz

Medium Resolution

 

Through I/O board, See Diagram on Page 45

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Coin Doors, Test Switch, and Volume Control Panel

Wire the coin doors as per the JAMMA Harness Connection table on page 43. Connect the door lamps to the appropriate (+12Vdc or +5Vdc) supply. Some games have separate power supply outputs for the lamps. Install a test switch somewhere convenient inside the coin door area. This switch allows you to enter adjustables, run diagnostics, and see or clear audits. Make it readily accessible through the coin door. Wire it to the Test wire on the JAMMA Harness. Silver Strike Bowling has the ability to adjust volume at any time during a game. Install two push button switches (not included) inside the coin door for easy access. Connect the switches to the JAMMA harness. Refer to the JAMMA Harness Connection table on page 43.

Initial Power-Up

There are several steps you should take when powering up your Silver Strike Bowling for the first time. This is a quick checklist for you to follow when doing your first initial power-up:

qPlug in the game and turn it ON; be sure the game powers up correctly into the attract mode.

qAdjust volume levels to desired settings.

qAdjust monitor settings for best picture.

NOTE:

Sound and Video Tests are available through the System Tests Menu. They are beneficial when making any adjustments. (See System Tests Menu on page 26). Proper monitor and sound adjustment is very important.

qTry all money slots. Drop quarters or tokens through to check the coin mechs and insert a bill into the bill acceptor. Make sure the game is adding credits.

NOTE: Silver Strike Bowling supports most bill acceptors. Installing a bill acceptor is highly recommended and will increase your earnings. Refer to your bill acceptor's manual for installation specifications. The bill acceptor can be wired to coin door 3 on the JAMMA.

qTest all of the player input controls. You can use the PLAYER CONTROL TESTS in the SYSTEM TESTS MENU.

qUpon initial power-up the game is set to factory default settings. These settings affect game elements such as number of credits per coin, difficulty settings, etc. The OPERATOR MENUS section (see page

21)will describe how to alter these settings for your location.

Congratulations!

You have finished installing Silver Strike Bowling!

Silver Strike Bowling™

Version 08/04

Page 15

© Copyright 2004 Incredible Technologies, Inc. All Rights Reserved. Unauthorized duplication is a violation of applicable law.

All other marks are the properties of their respective owners. All rights reserved.

Image 17
Contents Version 08/04 WARRANTY, REPAIR, and Return Policy Congratulations Table of Contents Silver Strike Bowling Kit Installation Kit Contents Including Part Numbers Your bag of parts 900265030 should include at least Recommended Tools Installation PreparationMonitor Requirements and Clean-Up Preparing the Cabinet for InstallationCabinet Cabinet SelectionGame Electronics Board InstallationSilver Strike Bowling Version 08/04 Power Switch is in the on position Nighthawk Chassis InstallationControl Panel Cabinet Identification Device InstallationTicket Dispenser Trackball and Button PreparationButton Preparation Control Panel Overlay InstallationTrackball Preparation Finishing The Control Panel Marquee Installation Side Decal InstallationFinishing The Kit Side Decals and MarqueeInitial Power-Up Dip Switch SettingsSW202 Dip Switch Settings = OFF 1 = on Positions Function SW200 Dip Switch Settings = OFF 1 = on Position FunctionSilver Strike Bowling Version 08/04 Silver Strike Bowling Dedicated Version Cabinet Dedicated ContentsDedicated Cabinets Dip Switch Settings Silver Strike Bowling Version 08/04 Silver Strike Bowling Operator Menus Value Reset Collections and Audits Reset Operator Mode MenusNavigating The Menus Main MenuGeneral Adjustments General SettingsOperator Adjustables Value Reset Money Slot Adjustments Value Reset General AdjustmentsMoney Slot Adjustments Value Reset Reset to Factory Settings Sound AdjustmentsValue Reset Sound Adjustments Video Tests Color AdjustmentsSystem Tests Mechanical Meter Contrast AdjustmentsSound Tests System Info Hardware TestsHardware/Software Version Info USB InfoCheck Hard Drive Begin TestCheck Cooling Silver Strike SettingsPlayer Cost Schedule Value Reset Player Cost ScheduleMoney Audits Game AuditsTicket Dispenser Audits Game Purchase AuditsBall Timeout Off. The default is set to On Delay TimeoutGame Options Vegas BowlingValue Reset Game Event Info Value Reset Game OptionsReset Game Events Game Event InfoTicket Dispenser Value Reset Reset LeaderboardsDispenser Settings Ticket Settings Value Reset Dispenser SettingsValue Reset Clear Tickets Owed Value Reset Ticket SettingsClear Tickets Owed Clear TicketsSilver Strike Bowling Troubleshooting Reference Appendix a Sound Problems Nighthawk Chassis Problems Jamma Harness Connection Trackball Harness Connection Power Cable Pin Out DiagramNighthawk Chassis and I/O Board Diagrams Detailed Cable Connection Diagram SSB Cabinet Wiring Diagram Cooling Icon Trackball Template and Orientation DiagramTickets Owed Icon Button Template and OrientationSilver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Silver Strike Bowling Version 08/04 Quantity Part Description Part Number Vendor Quantity Part Description Part Number Dedicated/KitGeneral Numbers IT Sales and ServiceIT Vendor Information Incredible Technologies, Inc