
STEP 1 | ORANGE BAG |
| • Slide the rubber covers on to the left |
| & right console supports, making sure |
| that the lower cutout is facing inward. |
|
|
| down the right console support using |
| the white wire tie as a guide. Make |
| sure that the data (1 large ribbon |
| cable) goes through the large hole in |
| the lower part of the console upright. |
| T9200, T9300, T9500HRT & |
| T9600HRT Series: Slide the data |
| cables down the right console support |
| using the white wire tie as a guide. |
| Make sure that the data cables (one |
| small grey & one large black |
| |
STEP 1 | large hole in the lower part of the |
console upright. | |
| • Insert the left console support into |
| the console support bracket and |
| secure with two bolts (M8 x 55L |
| Flathead) in the side of the console |
| support bracket. |
| • Insert one bolt (M8 x 20L) in the |
| rear of the console support bracket. |
| • Tighten all three bolts with the 5mm |
| Allen wrench. |
| • Repeat this on the right side. |
| NOTE: There are no data cables on |
| the left side. |
5