Chapter

2

SUPER PRO GUN

Handle Assembly 5105-00-01

See Figs. 9.3 & 9.4 for exploded schematic drawings

1.Carefully install the 5105-9-1 (Trigger Nut Seal) over the 5105-10-1 (Trigger Nut).

2.Coat the 7304-4-1 (Lip Seal) with 6706-3-1 (Pro Gun Oil), and push it into the 5105-10-1 (Trigger Nut).

NOTE

Onceinplacethespringofthe7304-4-1(LipSeal)shouldbefacingout.

3.Screw the 5105-10-1 (Trigger Nut) into the 5105-1-1 (Gun Handle), and tighten. Coat the 5105-14-1 (Trigger Stem) with 6706-3-1 (Pro Gun Oil) and install from the inside cavity of the 5105-1-1 (Gun Handle) through the 5101-10-1 (Trigger Nut).

4.Place the 5105-15-01 (Pivot Plate) into the slot in the

5105-1-1 (Gun Handle Assembly), and push the 7203-4-9 (Slotted Spring Pin) located on the back side of the 5105-16-1 (Trigger) into the hole in the 5105-14-1 (Trigger Stem). Line up the 5105-15-2 (Pivot Plate Bushing) to the lower pivot hole in the Gun Handle, insert the 7102-10-12 (Slotted Flat Head Screw) and tighten.

NOTE

WheninstallingtheTriggerAssemblythe5105-8-1(TriggerLock)mustbein the“down”position.

SUPER PRO GUN &

3

SUPER PRO GUN II

 

Page 8
Image 8
Roper M6707-1-1 manual Handle Assembly, See Figs .3 & 9.4 for exploded schematic drawings