Vision Fitness ST250 manual Cable #5

Page 13

STEP 6

Q

V

U

F

6b

Q

V

Cable #5

G

F

GREEN BAG

Attach the pulley structure (U) to the bottom rear floor support of the base unit with three bolts (M6x1Px15L), three flat (6.4x14x1T), and three spring (SW6.1x12.2x1.5T) washers. Tighten with a 4mm L-shaped wrench.

Slide pulley structure (Q) through the back side of the rear vertical support (base unit) and fasten securely with two spring (SW10.2x18.4x2.5T) & flat (10.5x18x2T) washers and two nuts (M10x1.5P). Use a 17mm wrench.

Feed the small steel end of cable #5 through pulleys (in the following order) F, G, Q, V. Place the slotted bolt (5a of base unit) around cable #5. Thread the nuts back on the slotted bolt. With the threads pointing up, thread the bolt into the rear termination tube (6b of base unit) far enough that the cable is taught. Tighten the locking nut against the bottom of 6b using a 19mm wrench.

13

Image 13
Contents S e m b l y G u i d e S e m b l y I d e Step Parts BOX Blue BAG Orange BAGGreen BAG Pink BAGBlack BAG Weight Plates Slide the rear vertical support 1c Blue BAG Pink BAG Cable #2 Cable #5 Ball End Fitting Decals S i o n