Vision Fitness ST200 manual Green BAG

Page 12

STEP 4 GREEN BAG

• Place the bottom of the left oval upright (4a) onto the protruding bolts of 1d. NOTE: Make sure the 27 holes of 4a are on the outside. Mate the hole in the top of 4a with the top hole of 3a. Attach and tighten one flat (10x30x2T) & spring (SW10.2x18.4x2.5T) washer and one bolt (M10x1.5Px60L). Tighten with a 6mm L-shaped wrench. Place one flat (10.5x18x2T) & one spring (SW10.2x18.4x2.5T) washer, and one nut (M10x1.5P) on both bolts protruding from 1d. Tighten with a 17mm wrench. Repeat the process with the right oval upright (4b).

3a

4a

1d

4b

1c

12

Image 12
Contents S e m b l y G u i d e S e m b l y I d e Step Parts BOX Orange BAG Blue BAGPink BAG Green BAGBlack BAG RED BAG Orange BAG Blue BAG Pink BAG Green BAG 1b 5g Cable #1 Cable #2 Yellow BAG RED BAG Decals Page S i o n