Vision Fitness ST200 manual Orange BAG

Page 9

STEP 1 ORANGE BAG

• Lay the back side of the rear vertical upright (1a) down onto the floor. The threaded bolt ends will be pointing up. Place the center floor support (1b) over the threaded ends. Attach a flat (10.5x18x2T) and spring (SW10.2x18.4x2.5T) washer and nut (M10x1.5P) to each end. Tip upright. Tighten fasteners using a 17mm wrench and a 6mm L-shaped wrench.

• Slide the right floor support (1c) up to the rear vertical support and attach with two bolts (M10x1.5Px60L), two flat (10.5x30x2T) washers (outside of tube), two flat (10.5x18x2T) washers, and two nuts (M10x1.5P). Repeat the process with the left floor support (1d). Tighten with a 17mm wrench and a 6mm L-shaped wrench. Attach the foot plate (1e) to the front surface of 1b with two flat (10.5x18x2T) & spring (SW10.2x18.4x2.5T) washers, and two bolts (M10x1.5Px25L). Tighten bolts with a 6mm L-shaped wrench.

1d

1a

 

1b

1e

1c

 

9

Image 9
Contents S e m b l y G u i d e S e m b l y I d e Step Parts BOX Blue BAG Orange BAGGreen BAG Pink BAGBlack BAG RED BAG Orange BAG Blue BAG Pink BAG Green BAG 1b 5g Cable #1 Cable #2 Yellow BAG RED BAG Decals Page S i o n