Vision Fitness ST200 manual Cable #2

Page 15

STEP 7 YELLOW BAG

If assembling just the base unit (ST200), proceed as follows. If assembling with the leg press (ST250), refer to Step 5 of the leg press assembly guide. Slide the small steel end of cable #2 through pulleys F and G. Remove the nuts from the slotted bolt (M12). Slide the cable through the slotted bolt (M12). Reattach the nuts to the slotted bolt. With the threads pointing up, turn the bolt clockwise into the lower end of 6b with a 19mm wrench, until the cable is taught. Finish by tightening the upper locking nut to the surface of 6b and the lower locking nut to the bolt head.

6b

Cable #2

G

F

15

Image 15
Contents S e m b l y G u i d e S e m b l y I d e Step Parts BOX Blue BAG Orange BAGGreen BAG Pink BAGBlack BAG RED BAG Orange BAG Blue BAG Pink BAG Green BAG 1b 5g Cable #1 Cable #2 Yellow BAG RED BAG Decals Page S i o n