11. | Wrap the Cable (31) around an 89mm Pulley | 11 |
|
|
| (26). Attach the Pulley and a Cable Trap (27) to |
|
| |
|
|
| 31 | |
| the Weight Carriage (10) with an M10 x 45mm | 32 |
| |
|
|
| ||
| Bolt (36) and an M10 Nylon Locknut (32). Make |
| 26 | |
|
|
| ||
| sure the Cable Trap is outside of the bracket |
|
| 27 |
| and oriented to hold the Cable in the groove |
|
| |
| of the Pulley. |
|
| 36 |
|
| 10 |
|
|
12. | Wrap the Cable (31) around an 89mm Pulley | 12 |
|
|
| (26). Attach the Pulley and a Cable Trap (27) to |
|
| |
|
|
|
| |
| the bracket on the Lat Tower (8) with the M10 x |
| 27 | 26 |
| 75mm Bolt (40) used in step 10 and an M10 |
| ||
|
|
| ||
| Nylon Locknut (32). Make sure the Cable Trap |
| 32 |
|
| is oriented to hold the Cable in the groove of |
|
| |
|
|
|
| |
| the Pulley. |
|
|
|
|
|
|
| 31 |
|
|
|
| 40 |
|
|
| 8 |
|
13. | Route the Cable (31) through the Lat Tower Base | 13 |
|
|
| (3) and around an 89mm Pulley (26). Attach the |
|
| |
|
| 32 26 |
| |
| Pulley to the bracket on the Lat Tower Base with |
|
| |
| an M10 x 45mm Bolt (36) and an M10 Nylon |
|
| 36 |
| Locknut (32). |
|
| |
|
| 31 |
|
|
|
|
| 3 |
|
14. | Route the Cable (31) under an 89mm Pulley (26) | 14 |
|
|
| and through the Foot Plate (13) as shown. Attach |
|
| |
|
|
| 33 | |
| the Pulley to the Foot Plate with an M10 x 45mm | 2 |
| |
|
| 32 | ||
| Bolt (36) and an M10 Nylon Locknut (32). |
|
|
|
| Attach the Foot Plate (13) to the Lat Tower Base | 36 |
| 33 |
|
| 32 | ||
|
|
| ||
| (3) with two M10 x 19mm Bolts (37) and two M10 |
| 26 |
|
| Nylon Locknuts (32). Do not tighten the |
| 32 | 32 |
| Locknuts yet. |
|
| |
| Attach the Foot Plate (13) to the Bottom Crossbar | 34 |
| 32 |
| (2) with two M10 x 94mm Bolts (34), two M10 | 31 |
| |
|
| 3 | ||
| Washers (33), and two M10 Nylon Locknuts (32). |
|
| |
| Tighten all of the M10 Nylon Locknuts (32) | 37 | 13 |
|
| used in steps |
|
| |
|
|
|
| |
|
| 9 |
|
|