ParaBody 950102 manual

Page 13

STEP11.

A.Securely assemble two 3/8" spring pins (62) to the leg curl/extension (8) as shown.

B.Apply eight 1-1/2 x 5/A-" glides (63) to the outside surfaces of each roller pad adiuster (34)

shown, and insert roller pad adjusters (34) into the leg curl/extenslon (8). (Note: Tl~e, end

will need to be temporarily

removed.)

"

 

C.Securely assemble leg frame (14) to the leg weight stack base (18) using two 1/2 x 5-.1/4" bolts (Bg), four 1/Z" washers (79), and two 1/Z" nylock nuts (B2).

D. Attach,f, aur ro~ler pods(19) to the ~e9curl/extension(S) andro~ler padadiuster~(34) ,,,sin~ two

16-3/4 roller pod .,;hafts (27), eight plastic washers (55) and four 3/4" starlock collar.; (54) c,s

14

Image 13
Contents SeriousSteel ~ ~o~ ~ two ~N~ ONF~ 91 3102943 BOLT,i/Z-13X~1/2 Frame Assembly Instructions Step 314 Tw~,bol~.11z Step Step 318 ~1/2 X 318 Page Assemble one selector Step Cable Guide Step F & H Step Step Step X ~-~/~~o=~~ss. ~.~ ~/s ~.g~ =p~=~7~, ~ o~ ~/s ~o=kn=~ S~ Page Ie~ ~uiderodsunno~25 ~innon~~/~.x 2-$/~bolt Shroud Assembly Instructions THIS. Concludestheassemblyof the PARABODY950 ST GYM