ParaBody 950 st manual ~ep

Page 23

S~ep 2

Secure the press cable (105) and two .~-1/2" pulleys

(111)to the pulley flats on the press base (15) and press weight stack base (1) using two 3/8 x 2" bolts

78). and 'two .~/8" nylock nu,s(83). (Note: The press cable should be routed underneath the short leg of the 'L' bracket. Also the 'L' brackets should be positioned straight down ,o function properly.)

B.Secure ,he press cable (105) and one 3-1/2" pulley (111) to the press guide rod support using one 3/8 x 2-3/4" bolt (99). two 3/8" flange spacers (74). and one 3/8" nyl(>ck nut (Note: Loop ,he cable over_the pulley prior to inserting it

Screw ,he threaded end of the press cable (105) approxima,ely 3/4" into the end of the selec,or shaft (113) and ,[ghten ]am nu, securely as shown.

If upon completion of assembly, the head plate (117) does no, sit on top of ,he firs, weight plate (67). push the head pla,e down. insed ,he selector pin (72) and perform several repetitions at the station. This will relax the cable system

and preven, the head pla,ed from lifting up.

sit on ~op of the firs, weight plate or if there is excess slack in the cable sys,em, adjust ,he threaded end of the

cable accordingly arid retighten the iam nut.

23

Image 23
Contents SeriousSteel Page Ii!!1 STPacts List Frame Assembly Instructions Step Four3/8 × 2-3/,~bo~ts99 andfour3/8 washers78 Siep4 Step Slap Step Step B ~OTE Both CAP TIGHT~D ¯-14 See Note Page Cable Guide Step F & H Step Step Step StepI ~ep Step Pec guid~, rod support 43 and the base 15 using This Concludes the Assembly of the Parabody 950 ST GYM