Pec Dec Cable Assembly Instructions
Use this procedure to assemble ~he pec dec cables of the Pc~raBody 950ST
Step C
Step F & H
LAT
CABLE
Stel3 1 order, route the threaded end of the lot coble (~403~! through the top boom (20), the boise A. ~r~5~h, iSen d the Icrge hole in the pec guide rod support
B.
Screw the threaded end of the lat cable (107) approximately 5/4" into the end of t'he selector shaft (113) and tighten jam nut securely as shown.
C.Securely assemble three
D.Securely ~ssemble ~wo
E.securely lighten ~he bolts of the pec 9uide rod support (43) ~nd fop boom (20) connection ~f
time. (Note: Center the pec guide rod suppo~ horizontally end vertically before tightening.
F.Apply two 1" x 1" glides (SO) to the flo~fing pulley (30), ~s shown.
G.Securey assemble,one
H.Securely assemble one
flo~fing pulley (30) onto the flo~fing pulley stop (32).
"'18