ParaBody Hip Sled System manual Sure-Loc

Page 18

BUSHING

45

8

9

7

SURE-LOC

BUSHING

22

FIGURE 14

STEP 14:

To assemble the CARRIAGE STOP BAR (7) to the side of the LEFT RAIL (8), start by inserting the top of the BAR (7) into the BUSHING at the top of the RAIL as far as possible, then lower the BAR (7) into the SURE-LOC BUSHING at the bottom of the RAIL. (MAKE SURE THE STOP PEGS ARE VERTICAL), then insert one 1-1/4” ROLL PIN (45) into the hole at the top of the BAR (7). (DO NOT LET THE ROLL PIN PROTRUDE BENEATH THE BAR) Repeat this step on the RIGHT RAIL (9).

Slide two 1-1/4 X 5” GRIPS (22) over the HANDLES on the CARRIAGE STOP BARS (7) as shown in FIGURE 14.

18

Image 18
Contents HIP Sled System Important Safety Information Important Notes ’ 2’ 3’ 4’ 5’ Parts List Do not Securely Tighten Platform to Rotate Freely Securelytighten Handles Both Sides 43 1/2 X 4-1/2 Height LOW Height Saftey Reverse View Step OFF-SETTOONESIDE Important !!! Tighten the NUT of the Spring PIN Securely Back the Nuts OFF 1/4 Turn SURE-LOC Make Sure ALL Connections are Securely Tightened Carriage This Concludes the Assembly of the 835 HIP Sled System Maintenance Limited Warranty Life Fitness