Life Fitness SM61 manual Set the weight stack cubes

Page 5

SM61 Unpacking & Assembly Instructions

Figure 3. Set the weight stack cubes.

2.Bolt on the teardrop pulleys above the lat benches (see Figure 4) on both cubes using two 3/8” x 2-3/4” hex head bolts (used to bolt the cross beam to the cross members and the adjustable pulley tops to the top beams). Include the 3/8” flat washer, end cap washers, end caps and 3/8” Nyloc (locknut). Use the bolt configuration shown in Figure 5. You may wish to use a pinch bar to align the bolt holes.

Figure 4. Bolt on the teardrop pulleys.

5

Image 5
Contents M051-K50-A137 Assembly Time Materials and Tools Required for AssemblyUnpacking Parts box contents box 1 on left, box 2 on rightSM61 main components AssemblySet the weight stack cubes Configuration for 2-3/4 and 3 bolts Mount lat tops and tricep tops Mount rubber bumpers and the weight stacks Bolt on the top plate Bolt the floating pulleys into the 190 lb weight stacks Mount the benches to the frame Removing the pulley bolts Installing the CablesAdjustable Crossover Cable Routing Adjustable crossover cable end detail LAT Pulldown Cable Routing Tricep pushdown cable routing Hardware Hardware . Assembly PartsHardware . Rubber caps Hardware . Cables Hardware . Cable jam nutHardware . Top assemblies Hardware . Floating pulleys Hardware . Weight stack rubber bumpersParts List Hardware installed InstalledPulley hardware Floating pulley