Life Fitness SM81 manual Bolt on the teardrop pulleys

Page 6

SM81 Unpacking & Assembly Instructions

Figure 4. Bolt on the teardrop pulleys.

Figure 5. Configuration for 2-3/4” and 3” bolts.

3.Using a 5/8” socket with extension and combination wrench, bolt on the connecting beam to the cubes using two of the large 7/16” x 6” bolts, 7/16” washers, and 7/16” nuts, end cap washers and end caps. Figure 6 shows the connected cubes.

6

Image 6
Contents M051-K50-B117 Materials and Tools Required for Assembly Assembly TimeParts box contents box 1 on left, box 2 on right UnpackingAssembly SM81 main components seats and cables removed for claritySet the weight stack cubes Bolt on the teardrop pulleys Mount lat tops and tricep tops Mount rubber bumpers and the weight stacks Bolt on the top plate Bolt the floating pulleys into the 190 lb weight stacks Mount the benches to the frame Installing the Cables Removing the pulley boltsAdjustable Crossover Cable Routing Adjustable crossover cable routingAdjustable crossover cable end detail LOW ROW Cable RoutingScrew the cable into the weight stack LAT Pulldown Cable RoutingTricep Pushdown Cable Routing Tricep pushdown cable routingHardware . Assembly Parts HardwareHardware . Rubber caps Hardware . Cable jam nut Hardware . CablesHardware . Top assemblies Hardware . Weight stack rubber bumpers Hardware . Floating pulleysParts List Pulley hardware InstalledHardware installed Floating pulley