SM81 Unpacking & Assembly Instructions
4.Using a 5/8” socket and combination wrench, mount the 56” lat tops (part T from HARDWARE section) to the cells by inserting two of the large 7/16” by 6” bolts using the hardware configuration shown in Figure 7. Mount the 29” tricep top (part U in HARDWARE section) and adjustable crossover top (part V in HARDWARE section) to the frame and connecting beam (See Figure 6). You will need to remove the pulleys from the teardrop pulley assemblies to gain clearance for the socket wrench extension. Leave the pulleys out of the housings until the cables have been installed.
3/8” x 3” (4)- bolt top beams together
U
T
T
Remove pulleys from housings to give clearance to socket extension
7/16” x 6” (8)- mount on tops
U
Figure 6. Mount lat tops and tricep tops.
Figure 7. Configuration for 6” bolts.
7