Life Fitness 8500 3 manual Detail

Page 26

SEE DETAIL 31

FIGURE 31

STEP 31:

29

50

45 AB CABLE

82

69

90 3/8 X 2-3/4”

48

DETAIL 31

Securely assemble the ball end of the AB CABLE (45) and one 4-1/2” PULLEY (48) to the FRONT UPRIGHT (29) using two 3/8 X 2-3/4” BOLTS (90), two 3/8” FLANGE SPACERS (69), two 3/8” WASHERS (80), and two 3/8” LOCKNUTS (82).(NOTE: The AB CABLE (45) should be routed underneath the retaining bolt as shown in DETAIL 31.)

 

 

 

82

 

26

 

 

STEP 32:

 

 

AB CABLE 45

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Route the AB CABLE (45) around the FLOATING PULLEY

80

 

 

 

BRACKET (55) using one 4-1/2” PULLEY (48), one 3/8 X 2”

 

 

 

67

 

 

 

BOLT (89), two 2-7/8 X 1” CABLE CLIPS (67), two 3/8” WASH-

 

 

 

ERS (80), and two 3/8” LOCK NUTS (82). See FIGURE 32.

 

 

 

 

• Screw the threaded end of AB CABLE (45) approximately 1” into

 

55

 

 

 

 

 

 

the end of the PULLEY BRACKET (26) and tighten jam nut se-

 

 

 

 

curely as shown in FIGURE 32.

 

 

 

 

 

 

IMPORTANT! Make sure the cables are running

 

 

 

 

 

 

in the grooves of all pulleys.

 

 

 

 

 

 

 

 

 

 

 

 

3/8 X 2” 89

 

 

 

 

 

 

 

FIGURE 32

0

1/2

1/2

1/2

1/2

1/2

 

1/2

1

2

3

 

4

5

6

 

 

 

26

 

 

 

 

Image 26
Contents 8500 3-STACK MULTI-GYM Important Notes Parts List Step Step 105 104 X 1-1/4 X 4 92 3/8 X LOW Height 86 LOW Height 6252 94 1/2 X 86 1/2 LOW Height 94 1/2 X 115 3/8 X 3 Counter Sunk X 1-1/4 97 1/2 X 6-1/2 101 91 3/8 X 3-1/4 Step 94 1/2 X 88 3/8 X 1-1/4 Same Time X 3-1/4 103 Button Head As shown in Figure Step Page LAT Cable It in the the slot Loosely assemble two 4-1/2 Pulleys PEC Cable Detail Press Cable Press CABLE38 Press