Spalding M8809511 manual Contact Utilities Before Digging

Page 3

1. Ensure ground is level with playing

 

 

 

 

surface, then dig pole hole.

 

 

 

 

WARNING!

 

 

PLAYING

 

 

 

SURFACE

 

 

 

 

 

 

 

24" (61 cm)

 

 

 

 

36" (91.4 cm)

 

 

 

 

 

GROUND

 

 

 

 

SURFACE

 

CONTACT UTILITIES

 

 

 

 

BEFORE DIGGING.

 

 

 

 

2. Install nut (2) to J-bolt (1) as

 

 

2

 

shown. Repeat procedure for

 

 

 

2-1/2”

3

 

 

other three J-bolts (1).

 

 

2

(6.35 cm)

 

 

 

 

 

 

 

IMPORTANT!

 

 

 

 

Make sure nuts are 2-1/2”

 

 

 

 

(6.35cm) from top of

 

 

 

 

J-Bolts.

1

 

 

 

 

 

 

 

 

 

 

 

2

NOTE:

 

 

 

 

Make sure J-bolts (1) are

 

 

 

 

in the illustrated position.

 

 

 

 

3. Install threaded ends of J-bolts (1) through holes in

1

 

 

 

 

 

mounting plate (3) and secure as shown.

 

 

 

 

NOTE:

 

 

 

 

Nuts on the top of plate are

 

 

 

 

used for leveling the pole after

 

 

 

 

system is fully assembled.

 

 

 

 

 

3

07/06

ID#

M8809511

Image 3
Contents In-Ground Basketball System Safety Instructions Contact Utilities Before Digging ID# M8809511 07/06 Surface Do Not Over Tighten Do Not Over Tighten Playing Do Not Over Tighten ID# M8809511 07/06 Set-up For Right Side Included With Rim Regulation RIM Height is Height Adjustment Hardware Identifier Bolts Hardware Identifier NUTS, Washers & Steel Spacers