CONSTRUCT FIRST BEAM

CAUTION: BRACES REQUIRED TO AVOID FRAME DAMAGE!!

15

8

7

B3

RW ON MID BEAMS, RWE ON END BEAMS

R21-9

GRW

16

MCW

9

10

17

14

13

U8

XRB FOR

(B3 FOR USE ON MIDDLE

(X-CABLED

BEAMS ONLY. NOT USED WITH

BEAMS ONLY)

GABLED END FRAMING.)

 

 

USE CROSS CABLE AS AN INSTALLATION TOOL TO SQUARE FIRST BEAM BEING RAISED. OPTIONAL ON OTHER BEAMS, DEPENDING ON TERRAIN. NOT REQUIRED FOR FINAL 40’ CONFIGURATION.

18

B4

6

12

5

11

2

1

 

 

 

 

 

T-30

 

 

BHW

 

 

 

 

 

 

 

MAKE CONNECTIONS IN NUMBER SEQUENCE

3

4

SHOWN. STAKE PLATES BEFORE ERECTING.

 

 

LAYOUT OF ALL BEAMS

ALL PLATES ARE STAKES

 

WITH T-30

CROSS CABLE USED FOR SQUARING

FIRST BEAM BEING RAISED. OPTIONAL

ON OTHER BEAMS. NOT REQUIRED

FOR FINAL UNIT CONFIGURATION.

UPPER ENDS OF ALL X-CABLES

INSTALLED BEFORE BEAMS ARE

RAISED.

FIRST (2) BEAMS BUTTERFLIED SO

ADJUST BASE PLATE GUIDE BARS FOR

THAT ADJACAENT BASE PLATE STAKES

PROPER SPACING AND ALIGNMENT OF

CAN BE USED FOR SAFETY GUYING.

BASEPLATES. (DROP BAR FITTING OVER

(2ND BEAM WILL BE RAISED FIRST.)

PINS IN BASE PLATES.)

2-PC SAFETY WEBS:

1.LOOP (4) LOWER SAFETY WEBS OVER STAKE HEADS OF THE ADJACENT BASE PLATES, BEAMS 1 & 3 (RATCHET ENDS UP).

2.CHOOSE (4) UPPER SAFETY WEBS LABELED FOR 10’, 15’, OR 20’ BAY SPACING, AS NEEDED FOR YOUR UNIT.

3.ON THE TRAILING WEBS (TO BEAM #3), INSERT THE LOOSE, HANGING ENDS OF UPPER WEBS INTO THE RATCHETS OF THE LOWER SAFETY WEBS. PULL ABOUT 1 FT OF WEB THRU THE RATCHET. LEAVE PLENTY OF SLACK.

4.SNAP UPPER ENDS OF UPPER WEBS TO THE EAVE BRACKETS OF THE BEAM TO BE RAISED.

5.LEAVE THE LEADING WEBS (TO BEAM #1) LOOSE AND HANGING UNTIL BEAM IS UP.

9

Image 9
Contents Navi-Trac Table of Contents 40’ Gabled Navi-Trac Frame Terminology 40’ NAVI-TRAC Component Illustrations Component Description 40’ Gabled END NAVI-TRACExtrusions W/CHANNELS PurlinsSTAKES, Cables & WEB Guys From Previous 40’ Gabled END NAVI-TRACNAVI-TRAC Installation Safety Guidelines Squaring the Tent Footprint Layout Construct First Beam Erecting 2nd Beam 1st DROP-IN RIDGE/EAVE Bars Cabled Bays Completing the TOP Frame Installing Gabled END FrameFabric Tensioning Installing MID Panel40’ x 80’ Gabled END NAVI-TRAC MLW BFW EIW BFW EFWEVANSVILLE, Indiana Phone Number FAX Number