TABLE OF CONTENTS
Page No. | Assembly Step |
3Introduction with Frame Terminology Illustration
4 Component Illustrations
5 40’
6 40’
7 Safety Guidelines
8 Squaring the Tent Footprint Layout and Diagonals Chart
9Assembling the first Beam
Assembly Layout of all Beams (Butterflying First Two Beams)
10Erecting the First Beam and Stabilizing the First Beam Erecting the Second Beam
11Connecting the First Two Beams Installing Purlins
Completing First Bay
12Completing the Top Frame Installing the Gabled End Frame Guying Out the Completed Frame
13Installing the Mid Panels and Gabled End Panels Tensioning Fabric Panels
14Completing the Gabled End Unit
Alternate Hip End/ Gabled End Configuration
15Combining Hip and Gabled End Assembly Steps Component Changes for Hip/ Gabled End Configuration
16Limits of Liability
2