ASSEMBLY
Assembly requires two persons. Place all parts of the elliptical crosstrainer in a cleared area and remove the packing materials. Do not dispose of the packing materials until assembly is completed.
Assembly requires the following tools: the included allen wrench, your phillips screwdriver ,
adjustable wrench , rubber mallet , and pliers .
As you assemble the elliptical crosstrainer, use the drawings below to identify the small parts used in assembly. The number in parenthesis below each drawing refers to the key number of the part, from the PART LIST on page 18. The second number refers to the quantity used in assembly. Note: Some small parts may have been
M10 Nylon | M8 Nylon | M8 Split | Spacer | M8 Washer (81)Ð6 |
|
| |
Locknut (26)Ð7 | Locknut (80)Ð2 | Washer (58)Ð2 | (44)Ð4 |
|
| ||
|
|
|
|
|
| Nylon Washer | |
| M8 x 108mm Bolt (79)Ð2 |
|
|
|
| (11)Ð2 | |
|
|
|
|
|
| ||
| M10 x105mm Carriage Bolt (27)Ð2 |
| M10 Split | Axle Screw (30)Ð2 | |||
| Washer (93)Ð4 | ||||||
| M10 x 85mm Bolt (25)Ð1 | M4 x 16mm | Console Plate | M4 x 16mm | |||
|
|
| Flange Screw | ||||
|
|
| Screw (35)Ð9 | Screw (92)Ð4 | (43)Ñ6 |
1. Hold the Rear Stabilizer (65) against the saddle on the |
rear of the Frame (1). Make sure that the Stabilizer is |
turned so the square holes are facing away from the |
Frame. Attach the Stabilizer with two M10 x 105mm |
Carriage Bolts (27) and two M10 Nylon Locknuts (26). |
126
2. Turn the Resistance Control (57) counterclockwise to |
the minimum setting. |
If the Resistance Control (57) is attached to the Upright |
(2), remove the M4 x 16mm Screw (35). Pull the bot- |
26
1
65
2
27
tom of the Resistance Control away from the Upright |
and then slide it down to remove it. |
Tab
57
2 35
5