
A S S E M B LY
I N S T R U C T I O N S
Step 2b
F R A M E A S S E M B L Y
(Factory Installation) Insert (CE) into (1), and (CA) into (5). Attach
(5)to (2) and (3). Next, attach (7) to (5), then (6) to (5) and (7). Now, attach two (CE)’s to (1); then, (CD) to (6), insuring the set screws are facing inwards toward (1) . Hand tighten bolts only, they will be tightened later. Lift machine to position (4).
Part Descriptions | Hardware Descriptions | |
1 | - Weight Cage | A - |
2 | - Mount Assembly | B - |
3 | - Bottom Mount Assembly | C - |
4 | - Rubber Foot Pad | AA - 1/2” Lock Washer (White Zinc) |
5 | - Seat Frame Assembly | AB - 1/2” Flat Washer (White Zinc) |
6 | - Seat Support Mount | AE - 3/8” Flat Washer |
7 | - Seat Mount Support | AF - 3/8” Flat Washer (White Zinc) |
|
| CA - Insert 1/2” |
|
| CD - Pillow Block Bearing |
|
| CE - 4 Hole Flange Bearing |
| HOIST | R | |
Page 9 | 2601 Assembly | ||
FITNESS SYSTEMS |