Impex PWR 8 manual Diagram

Page 21

STEP 4 (See Diagram 4)

A.) Attach the Leg Developer (#5) to the open bracket on the Main Frame (#1). Secure it with an Axle (#17), two M10 x ¾” Allen Bolts (#35), and two ¾” Washers (#41).

B.) Insert one Foam Tube (#10) halfway through the hole on the Main Frame. Insert two Foam Tubes halfway through the holes on the Leg Developer (#5). Push six Foam Rolls (#24) onto the Tubes from both ends. Plug six Foam Roll End Caps (#25) into the ends.

C.) Slide the Olympic Sleeve (#20) onto the weight post on the Leg Developer. Attach a Spring Clip (#22) to the Sleeve.

DIAGRAM 4

20

Image 21
Contents Powerhouse Club Before YOU Begin Table of ContentsImportant Safety Notice SQUAT/LAT Pull Hardeware Pack SQUAT/LAT Pull Hardeware Pack Diagram SQUAT/LAT Pull Machine Assembly InstructionSee Diagram Diagram See Diagram Cable Loop Diagram See Diagram 5 & Cable Loop Diagram Diagram See Diagram 6 & Cable Loop Diagram Exploded Diagram Description SQUAT/LAT Pull MachineMULTI-PURPOSE Bench Hardware Pack MULTI-PURPOSE Bench Assembly Instruction See Diagram Diagram Diagram Diagram Page MULTI-PURPOSE Bench Parts List Impex INC