Impex PWR 8 manual See Diagram

Page 7

STEP 2 (See Diagram 2)

A.) Attach an Upright Beam (#4) to the Right Stabilizer (#1) and the Right Support (#5). Secure the Upright Beam to the Right Stabilizer with two M10 x 2 3/8” Carriage Bolts (#56), one 7” x 3 1/8” Bracket (#26), two Ø ¾” Washers (#67), and two M10 Aircraft Nuts (#69).

B.) Secure the Upright Beam to the Right Support with two M10 x ¾” Allen Bolts (#63) and two Ø ¾” Washers (#67).

C.) Repeat Steps A and B above to install the other side.

D.) Place the Upper Frame (#8) onto the two Upright Beams. Secure each end of the Upper Frame with three M10 x 5/8” Allen Bolts (#64) and Ø ¾” Washers (#67).

E.) Securely tighten all the Nuts and Bolts previously installed.

6

Image 7
Contents Powerhouse Club Before YOU Begin Table of ContentsImportant Safety Notice SQUAT/LAT Pull Hardeware Pack SQUAT/LAT Pull Hardeware Pack Diagram SQUAT/LAT Pull Machine Assembly InstructionSee Diagram Diagram See Diagram Cable Loop Diagram See Diagram 5 & Cable Loop Diagram Diagram See Diagram 6 & Cable Loop Diagram Exploded Diagram Description SQUAT/LAT Pull MachineMULTI-PURPOSE Bench Hardware Pack MULTI-PURPOSE Bench Assembly Instruction See Diagram Diagram Diagram Diagram Page MULTI-PURPOSE Bench Parts List Impex INC