STEP 2 (See Diagram 2)
A.) Attach an Upright Beam (#4) to the Right Stabilizer (#1) and the Right Support (#5). Secure the Upright Beam to the Right Stabilizer with two M10 x 2 3/8” Carriage Bolts (#56), one 7” x 3 1/8” Bracket (#26), two Ø ¾” Washers (#67), and two M10 Aircraft Nuts (#69).
B.) Secure the Upright Beam to the Right Support with two M10 x ¾” Allen Bolts (#63) and two Ø ¾” Washers (#67).
C.) Repeat Steps A and B above to install the other side.
D.) Place the Upper Frame (#8) onto the two Upright Beams. Secure each end of the Upper Frame with three M10 x 5/8” Allen Bolts (#64) and Ø ¾” Washers (#67).
E.) Securely tighten all the Nuts and Bolts previously installed.
6