Diamondback 900Sr manual 900Ub Upright Assembly Drawing, 900Ub Upright Assembly Instructions

Page 3

900Ub Upright Assembly Drawing

6

900Ub.Sr OM.R1.indd 6-7

900Ub Upright Assembly Instructions

Step 1: Stabilizer Bars Assembly

1. Place rear stabilizer bar under rear main frame body and align screw holes.

2. Insert two M8 x 90mm bolts into the stabilizer bar all the way through and into the holes on the frame

3. Secure rear stabilizer bar using an M8 nut and a curved washer on each bolt.

4. Repeat steps 1 – 3 to attach front stabilizer bar.

Step 2: Pedal Assembly

1. Use a 15mm open-end wrench to fi rmly affi x the pedals to the cranks. 2. The left and right pedals are different and are denoted as right or left (R

or L) on the top & bottom of each pedal. NOTE: Left pedal threads counterclockwise.

3. Retighten cranks after approximately 10 hours of use.

Step 3: Seat Post and Saddle assembly

1. Loosen the seat pin by turning it counter-clockwise 1-2 turns. Install seatpost by sliding it into seatpost receptor, pulling the seat pin out until a suitable hole is found.

2. Assemble saddle onto seatpost.

3. Tighten the affi xing nut and washer using a 17mm open-end wrench. SADDLE ANGLE ADJUSTMENT HINT: Hold the rear of saddle in the optimum comfort position and tighten the nut at the same time

Step 4: Console Mast Assembly

1.Remove the console mast plastic cover from the unit's body

by un-smapping it.

2. Install console mast cover onto console mast.

3. Connect the main wire harness in the main frame to the main wire harness in the bottom of the console mast, taking care to install correctly. (See plug alignment marks)

4. Install the console mast by sliding it into the console mast receptor while gently pulling the wiring harness. This will keep the slack out of the harness so the wires will not get pinched and short out. Insert and tighten three M8 x 16mm bolts, one fl at washer on each side and a curve washer on the front using a 6mm Allen wrench. Be sure not to pinch wire harness while tightening these three screws and make sure that the two top holes are lined up with the holes on the receptor.

7

6/11/2008 9:56:03 AM

Image 3
Contents Purchasers Reference Information Table of ContentsIntroduction Safety Instructions and Warnings900Ub Upright Assembly Instructions 900Ub Upright Assembly DrawingTransformer Assembly 900Sr Recumbent Assembly DrawingHandlebar Assembly Console Assembly900Sr Recumbent Assebly Instructions Seat AssemblyRear Handle Bar Assembly Pedals AssemblyQuantity & Quality BMI = weight lb/ height² in xWorkout Guidelines Maximum Heart Rate & Training ZoneOperating Tips ConsoleGlossary of Terms Pulse Hand Grips StandardDefault Values Console Layout Function Keys AudioAudio Workout Programs Warm UpCool Down Quick Start Program Default ValuesPause, Reset, or Switch programs Workout SummaryRandom ManualIntervals Hill Climb Heart Rate Monitoring Device Must be Used for this Program Fitness Test11/2008 95626 AM Custom Trainer StrengthModify Profile Target HR HR Interactive ProgramsHeart Rate Monitoring Device Must be Used for this Program HR IntervalsMaintenance Domestic Warranty Information 900Ub.Sr OM.R1.indd 11/2008 95628 AM IMPORTANT! IMPORTANT! IMPORTANT! Important Warranty Card