
  | 
  | 25  | 13  | 
  | 
  | 
  | |
14. NOTE: Two people recommended for this  | 
  | 5  | 
  | 
  | 
  | 
  | |
procedure. Attach bracket assembly to top pole | 
  | PLAY  | 
  | 
section (5). Secure hardware as shown and  | 
  | 
  | |
  | POSITION  | 
  | |
tighten completely. Install pole cap (25).  | 
  | 8  | 
  | 
  | 24  | 
  | |
  | 
  | 
  | |
  | 
  | STORAGE  | 7  | 
  | 
  | POSITION  | 
  | 27  | 
  | 26  | 
27  | 27  | 
  | |
  | 23  | 
  | 13  | 
  | 13  | 
15. Bend upper halves of backboard brackets (23) to line up with mounting holes on backboard as shown.
23  | 
16. Attach back bracket (26) to backboard and backboard brackets (23) as shown and finger
tighten. NOTE: Do NOT tighten completely. Final adjustments will be made in step 24.
printed on recycled paper  | 7  | 5/99  | P/N 211387  | 
  | 
  |