Weider 240 TC, WEEVBE1409.0 manual Repeat this step for the other side of the weight bench

Page 11

14.Attach the Left Barbell Hook (51) to a Weight Rest (13) as shown with an M10 Silver Washer (70) and an M10 Silver Locknut (34). Do not overtighten the Silver Locknut; the Left Barbell Hook must pivot easily.

Insert the Weight Rest (13) into the Left Upright (6), and tighten an Upright Knob (27) through the Left Upright into one of the adjustment holes in the Weight Rest.

Repeat this step for the other side of the weight bench.

15.Insert a Short Pad Tube (35) into the Left Fly Arm (10). Slide a Small Foam Pad (26) onto the Short Pad Tube.

Repeat this step for the other side of the weight bench.

16.Attach the Curl Pad (20) to the Curl Post (9) with two M6 x 16mm Screws (61).

14

51

70 34

 

 

 

13

27

 

 

6

 

15

 

 

 

10 35

26

16 20

9

61

11

Image 11
Contents Model No. WEEVBE1409.0 Serial No QUESTIONS?Table of Contents Important Precautions Before YOU Begin Assembled DimensionsPart Identification Chart Assembly See the inset drawing. Insert the Crossbar Pin Repeat this step for the other side of the weight bench M6 Washers 65. Do not tighten the Screws Yet Repeat this step with the other two Long Pad Tubes Repeat this step for the other side of the weight bench Under the storage hook Tower 14 make sure that the Cable isAdjusting the Weight Rests AdjustmentUse solvents to clean the weight bench Adjusting the BackrestUsing the LEG Lever Using the FLY ArmsKnob is in the hole in the Lat Tower Using the LAT TowerUsing the Curl PAD Storing the Weight Bench Exercise Form Exercise GuidelinesFour Types of Strength Workouts Workout GuidelinesQty Description R0909AExploded DRAWING-Model No. WEEVBE1409.0 R0909A Ordering Replacement Parts