31. Attach a 90mm Pulley (48) to the Front Leg (10) |
| |
31 | ||
with an M10 x 65mm Bolt (85), two M10 Washers | ||
| ||
(80), two 13mm Steel Spacers (109), and an M10 |
| |
Nylon Locknut (77). Make sure the Leg Lever |
| |
Cable (51) is under the Pulley. |
|
10 85
80 109
48
51
109
80
77
32. Route the Leg Lever Cable (51) under the | 32 |
|
|
|
89.5mm Spacer (59), through the Upright (2), and |
|
|
| |
|
|
|
| |
under the indicated rod in the Base (1). Wrap the |
|
|
|
|
Leg Lever Cable around a 90mm Pulley (48). |
|
|
|
|
Attach the Pulley to the Base with an M10 x |
|
|
|
|
45mm Bolt (86), two Half Guards (55), and an |
|
|
|
|
M10 Nylon Locknut (77). | 86 | 48 |
|
|
|
| 51 | ||
| 55 |
|
| |
|
|
|
| |
| 59 |
|
|
|
|
| 1 | 55 | 77 |
|
|
|
| |
| Rod |
|
|
|
33. Wrap the Leg Lever Cable (51) over a 90mm 33 Pulley (48). Attach the Pulley, a Cable Trap (56),
and two Half Guards (55) to the second hole from the bottom of the Pulley Plates (60) with an M10 x 50mm Bolt (97) and an M10 Nylon Locknut
(77). Make sure the Cable Trap and the Half
Guards are oriented as shown.
60 | 55 | |
77 | ||
97 | ||
55 | ||
| ||
56 | 48 | |
| ||
51 |
|
19