Maytag MDG30PCC installation manual Preparation for Operation and START-UP

Page 28

H. PREPARATION FOR OPERATION AND START-UP

The following items should be checked before attempting to operate the dryer:

1.Read ALLCAUTION,” “WARNING,” and “DIRECTION” labels attached to the dryer.

2.Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label.

3.Check to assure that the dryer is connected to the type of heat or gas indicated on the dryer data label.

4.The sail switch damper assembly was installed and adjusted at the factory prior to shipping. However, each sail switch adjustment must be checked to assure that this important safety control is functioning.

5.Check bolts, nuts, screws, terminals, and fittings for tightness.

6.Be sure that ALL gas shutoff valves are in the open position.

7.Check ALL back guard panels and service box covers have been replaced.

8.Make sure the lint coop support bracket has been removed.

9.Check the lint door to assure that it is closed and secured in place.

IMPORTANT: If during installation the lint door safety chain was disconnected, it must be reconnected or personal injury may result.

10.Rotate the basket (tumbler and drum) by hand to be sure it moves freely.

11.Check bolts, nuts, screws, terminals, and fittings for security.

12.Check basket (tumbler) bearing setscrews to ensure that they are ALL tight.

24

Image 28
Contents MDG30PCC Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Procedure for Functional Check of Replacement Safety Precautions SectionPage Specifications FXPSpecifications GAS only Installation Procedures Unpacking and Setting UPLocation Requirements Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Single Dryer Venting Vertical Venting Multiple Dryer Common Venting Illus. D Importantventingreminders Electrical Information Electrical Requirements75,&$/659,&63&,,&$7,2163555 Odfn 3RVLWLYH KLWHRU5HG Uhhq UrxqgGAS Information 732*$6 This Pipe Size Requirement Page Preparation for Operation and START-UP Preoperational Tests Preoperational Instructions Coin Models Basket Tumbler CoatingShutdown Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Cleaning Routine MaintenanceSuggested Cleaning Schedule Adjustments LubricationSectionvii Datalabel InformationSerial Number Procedure for Functional Check Replacement Components SectionviiiPage Phase Manual Reset Burner HI-LIMIT InstructionsDual Timer 15/04