English
INSTALLATION INSTRUCTIONS
Select a suitable location for the dryer on a hard even surface away from direct sunlight or heat source e.g. radiators, baseboard heaters, cooking appliances etc. Any floor unevenness should be corrected with the leveling legs located on the bottom of the dryer.
Tools and Materials Required
•Phillips head and flathead screwdrivers
•
•1/2 inch open end wrench
•Carpenter’s level
•Measuring tape (12ft. min.)
•Duct tape
•Rigid or flexible metal 4 inch (10.2 cm) duct
•Vent hood
Electrical Requirements
Power Supply:
3 or 4 wire, 240 Volt, 30 Amp, 60Hz, 1 Phase
Power Supply Cord Kit: (not supplied when sold in the United States) The dryer MUST employ a
Unpacking Your Dryer
1.Remove all packaging material. This includes the foam base and all adhesive tape holding the dryer accessories inside and outside.
2.Inspect and remove any remains of packaging, tape or printed materials before using the dryer.
12