American Dryer Corp D-78 installation manual SINGLE-PHASE 1Ø Electrical Connection Leads, Ground

Page 25

SINGLE-PHASE (1Ø) ELECTRICAL

CONNECTION LEADS

Black

 

 

 

White

 

 

 

 

Green

+

 

 

-

 

 

 

 

 

 

 

 

 

 

 

Positive

 

 

Neutral

 

 

 

Ground

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

or

 

 

 

 

 

 

 

 

 

 

 

 

L2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

b.3-Phase (3ø) Wiring Connections (hookup) - For Non-Reversing Models Only

The electrical connections on ALL 3-phase (3ø) gas model dryers are made into the rear service box located at the upper left area of the dryer.

NOTE: A CIRCUIT SERVICING EACH DRYER MUST BE PROVIDED.

If local codes permit, power to a gas dryer can be made by the use of a flexible U.L. listed power cord/ pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In ALL cases, a strain relief must be installed where the wiring enters the dryer.

21

Image 25
Contents Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Reversing Timer SPIN/DWELL Adjustments Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsPage Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Requirements General Exhaust Ductwork Information Exhaust RequirementsPage Page Page Electrical Requirements Electrical Information78 Gas Page Ground SINGLE-PHASE 1Ø Electrical Connection LeadsPage Page GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP Preoperational Tests Basket Tumbler Coating Selection can be made Preoperational InstructionsShutdown Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Cleaning Routine MaintenanceSuggested Cleaning Schedule Lubrication AdjustmentsOPL Dual Timer Models only Reversing Timer SPIN/DWELLADJUSTMENTSData Label Data Label InformationSerial Number OPL Sensoractivated Fire Extinguishing F.E. System F.E. System In ActionBefore YOU Start Check Local Codes and Permits InstallationTypical water supply Optional Manual Bypass System Reset Sensor Activated Fire Extinguishing S.A.F.E System SensorActivated Fire Extinguishing S.A.F.E. System Coin Sensor Activated Fire Extinguishing F.E. System Installation Typical water supply Optional Manual Bypass Disabled Sensor Activated Fire Extinguishing S.A.F.E. System Sensor Activated Fire Extinguishing S.A.F.E System Qty ADC113373 04/01/02-25 12/12/02-25